The solution was then finally to handle the units at HHLA Container Terminal, via the container bridges onto SPMT trailers which covered the last meters to site. The operation went very smooth and without any issues as shown on the pictures.
Cargo details:
4 x Steel Structures
Each approx. 2400x 730 x 220 cms / each 65 tons.


