Alexander Global Logistics was chosen to handle the FOB delivery of a 203-ton-boiler including some accessories ex factory yard till FOB Hamburg.
The waste heat boiler had a gross weight of 207 MT and a dimension of 1598 x 388 x 460 cm. AGL used 3x40’ SOC containers.
The transport ex site till Hamburg port was performed by barge via German inland rivers. In order to minimize the handlings as much as possible, the timing of arrival at export terminal was under a special control. It was planned perfectly so that the barge arrived along side ocean vessel MV “Palamerton” just in time so that the boiler could be transferred directly by the ships gear.