Start



We are happy to report about our most recent project. AGL Germany moved a total of 3.500 tons of freight from Germany to Tobolsk in central Siberia (Russia).

Amongst this project lot were 6 Quench Exchangers, each one measuring 8.8 x 3 x 3.5m and weighing 50 tons.

The Project also included 24 crates of LTE-exchangers, each weighing 14 tons. The cargo was transported by truck and barge to Hamburg/Antwerp and shipped out from there by sea-river-vessels straight to the final destination. In Russia we used the Russian inland waterways to get to the Russian port of Tobolsk in the Tjumen-region. The total distance was more than 5.000 km.

For this transport our project logistic experts at AGL Germany worked closely with AGL Russia to organize the complete door-to-door transport-chain including surveying.











Back to Top
Um unsere Webseite für Sie optimal zu gestalten und fortlaufend verbessern zu können, verwenden wir Cookies. Durch die weitere Nutzung der Webseite stimmen Sie der Verwendung von Cookies zu.